Program listing

Download the published 3 monthly program PDFs

Current Filter | Leader Id=2479 Remove filter

Calendar View or list for May 26 | Jun 26 | Jul 26 | Aug 26 | Sep 26 | and beyond.
Leader contact details and activity meeting details are hiden. Members please log in for full details.

17 May, Sun 8:00AM Great North Walk Stage 3 – Thornleigh to Hornsby
Grade:3/6 Length 10km  520m Sydney Branch
30102
Walk | A bushwalk of any kind short or longPublic Transport | There are public transport options to and from this activity.(NEW!!!) After a short traverse of suburban streets the track dives into bush at the southern end of the Park, passing remnants of the historic Zig Zag Railway, then wandering through Berowra Creek valley, passing a few cascading creeks. The track undulates along the side of the valley through moist fern forests and the drier grasstrees and eucalypts of the ridge. The Westleigh engravings can be visited along with the Fishponds, before climbing the Depression-era stone steps to Hornsby Station. Later stages of the GNW will be offered over coming months. Joint walk with Bush Club. Medium pace. Uneven surfaces, steps, tree roots. Slippery after substantial rain. Steep climb up steps at the end.
Location: Berowra Valley N P Limit: 20. View

1