Helensburgh Station Loop
2 Aug, Wed 9:05AM | Helensburgh Station Loop | ||||
Grade:3/6 | Length | 14km | ↑420m | Southern Sydney Branch | |
Loan | |||||
Walk down through beautiful rainforest near to the southern entrance to the Helensburgh railway tunnel. On via well walked tracks through some stands of massive old growth trees. Staying on the western side of the Hacking River with some up and down and easy creek crossings. A steadier track back up to the station on via the northern end of the railway tunnel. Limit:15. T: From: 2 Aug 2023, 9:05AM |