Download the published 3 monthly program PDFs
Current Filter | Leader Id=440 Remove filter
Calendar View or list for Jul 24 | Aug 24 | Sep 24 | Oct 24 | Nov 24 | and beyond.
Leader contact details and activity meeting details are hiden. Members please log in for full details.
8 Aug, Thu |
Helensburgh to Semi Detached Point and return |
Grade:3/6 |
Length |
18km |
660m |
Illawarra Branch |
Adrian J. |
From Helensburgh Station follow a variety of un-named tracks to Semi Detached Point near Era Beach. Return via Cutty Ridge, Burgh track and alternative route back to the station. Great track walking in some seldom used routes. river crossings, rocky sections. Location: Garawarra SCAand Royal NP Limit: 20.
View |
22 Aug, Thu |
Stanwell Park to Waterfall |
Grade:3/6 |
Length |
21km |
600m |
Illawarra Branch |
Adrian J. |
(Date Changed) Descend from the station and follow paths to then ascend the new sandstone staircase to Bald Hill. Continue along the Coast Track to Burning Palms and head up the Burgh Track to Garawarra Farm. Follow Bolo Ridge along sometimes faint track. Descend to Lady Carrington Drive. Follow the Forest Island, Couranga and Uloola Tracks to Waterfall Station. A lot of variety. Rocky and slippery sections, river crossings Location: Royal NP Limit: 20.
View |